Projects
Sort by:
newest
Filters
Budget
Implementation period
Filtered result: 30
A list of available projects for investment, as well as projects in development.

is being realized
Infrastructure
Creation of a laboratory for the study of industrial and construction waste
Implementation period
36 months
Required funding
€820,000

is being realized
Infrastructure
Project for strengthening and ensuring water supply in the city of Kryvyi Rih “Water pipeline from the Karachuniv reservoir to the first node through the Western pumping station
Implementation period
24 months
Required funding
€14,967,100

in the process of preparation
Energy efficiency
Comprehensive Modernisation of Utility Networks in Multi-Apartment Residential Buildings
Implementation period
36 months
Required funding
€7.8 million

in the process of preparation
Infrastructure
Comprehensive Modernisation of the Water Supply System in the Northern Part of the City of Kryvyi Rih
Implementation period
48 months
Required funding
€45 million

in the process of preparation
Energy efficiency
Construction of a hydrogen production plant
Implementation period
24 months
Required funding
€6.5 million

is being realized
Others
Kryvyi Rih Office for European Integration
Implementation period
12 months
Required funding
€232 thousand

is being realized
Startups
Gravic-Acc
Implementation period
30 months
Required funding
€14 thousands

is being realized
Startups
FindNGo
Implementation period
24 months
Required funding
€ 45 thousand

is being realized
Startups
CatchWind
Implementation period
24 months
Required funding
€112 thousands