logo
IcMenu
IcMenu

uk
en
facebooktelegramviber

Creation of an adaptive water supply system resistant to hydraulic shocks caused by blackouts

illustrationillustrationLarge
Project goals

01

Ensure a stable water supply for the residents of Pokrovskyi district by replacing damaged pipeline sections

02

Reduce water losses in the network, which will improve the overall efficiency of the system and reduce unnecessary water consumption

03

Increase energy efficiency in the water supply system by reducing energy consumption for water transportation

04

Strengthen the resilience of the water supply system to external threats, including rocket attacks, landslides and water hammer

Expected results

IcPlan

Reduction of total water losses

Approximately 1,177 thousand m³ per year

IcPlan

Reduction of accidents in Pokrovskyi district

By 30% (from 2028 to 1,420 per year)

IcPlan

Saving electricity

The reduction in electricity costs will be approximately 2,600 MW per year

illustrationillustrationLarge
CloseModalIc