Projects
Sort by:
newest
Filters
Budget
Implementation period
Filtered result: 13
Category
A list of available projects for investment, as well as projects in development.

in the process of preparation
Energy efficiency
Comprehensive Modernisation of Utility Networks in Multi-Apartment Residential Buildings
Implementation period
36 months
Required funding
€7.8 million

in the process of preparation
Energy efficiency
Construction of a hydrogen production plant
Implementation period
24 months
Required funding
€6.5 million

in the process of preparation
Energy efficiency
Installation of solar power plants at the boiler stations of CEHN “Kryvorizhteplomerezha”
Implementation period
24 months
Required funding
€5,652 thousand

in the process of preparation
Energy efficiency
Installation of solar power plants and high-capacity batteries at pumping stations of the Municipal Enterprise "Kryvbasvodokanal"
Implementation period
24 months
Required funding
10 mln EUR

is being realized
Energy efficiency
Proposal for partnership in the field of renewable energy sources
Implementation period
36 months
Required funding
500 mln EUR

in the process of preparation
Energy efficiency
Pilot project for optimising energy consumption of CE "KRYVBASVODOKANAL"
Implementation period
12 months
Required funding
0,85 mln EUR

in the process of preparation
Energy efficiency
Creation of an adaptive water supply system resistant to hydraulic shocks caused by blackouts
Implementation period
12 months
Required funding
1 mln 760 thou. EUR

in the process of preparation
Energy efficiency
Creation of adaptive heat supply system resistant to water hammers caused by blackouts
Implementation period
12 months
Required funding
35 mln 138 thou. EUR

in the process of preparation
Energy efficiency
Improving the energy efficiency of boiler houses
Implementation period
18 months
Required funding
26,056 mln EUR